Chiller Installation Requirements. 1. Foundation & Mounting ⇒ Concrete Plinth/Base: Should be flat, leveled, and minimum 150 mm above FFL. Designed to take dead load + dynamic load of the chiller. Ensure plinth length/width matches OEM mounting dimensions. ⇒ Vibration Isolators: Use spring isolators or neoprene pads below the chiller to reduce vibration and structure-borne noise. For rooftop units, include seismic restraints if required by local codes. 2. Piping Arrangements ⇒ Chilled Water Lines Inlet & Outlet properly labeled. Use flexible rubber bellows at inlet/outlet to absorb vibration and thermal expansion. Provide isolation valves, y-strainer, and flow switch. Install thermometers & pressure gauges at inlet and outlet for monitoring. Ensure correct pipe supports as per spacing schedule to avoid sagging. ⇒ Condenser Water Lines (for water-cooled only) Similar provisions as above. Ensure proper sloping and venting. Include chemical dosing point,...
All about HVAC system working principle, formulas, calculation, installation, commissioning,operation, maintenance, capacity, types, designs, drawing etc.